Successful use of formwork in the Kingdom of Saudi Arabia
The City of Medina (Saudi Arabia) is building the country's largest sewage treatment plant
After Mecca, the City of Medina (Al Madinah Al Munawwarah) in the Kingdom of Saudi Arabia is regarded as the second most important City in all of Islam. It is an up and coming metropolis of 1.7 million residents. As a means to protect the environment, the City is building a sewage treatment plant for 1 million people. It cleans waste water in three steps to a level of clarity that permits the use of the water for agricultural irrigation. The project is budgeted at 300 million Riyal (61 million Euros). It is the largest sewage treatment plant proposed for all of Saudi Arabia.Written by Grad. Geol. Frank G. Gerigk
Photo by Jürgen Kiehl
Implementation made easy - with the LOGO.3: A crane lift is easily capable of repositioning a large unit – even at a height of 9.05 meters.
Medina (Saudi Arabia)
SysTech (Branch Office Riyadh) was awarded the contract and started earth-moving operations in January 2012. The building carcass work on the 120,000 m² construction site began in June 2012. Commissioning is scheduled for August 2014.
New structures are built in three construction phases. Each will include two large activated sludge basins (98.50 x 56.70 meters), equipped with six flow inversions over a span of 9 meters, which move the water volume. Large round basins (outside diameter: 39.90 meters), small round basins (outside diameter: 33.60 meters) and several conventional technical infrastructure buildings will be built adjacent to these.
Formwork and concrete construction
This construction site also relies on the LOGO.3 wall formwork from PASCHAL.
When the wall formwork arrives at the construction site, all foundations have already been poured.
The rigging supervisor from Germany instructed the crews in the best use of the formwork at the construction site.
In order to attain the formwork height of 9.05 meters, two elements with a height of 3.40 m (at a width of 2.40 m) were installed, and two elements with a height of 2.40 m, but widths of 1.35 m and 0.90 m, were stacked on top of these in a sideways orientation.
Setup, assembly and implementation proved to be surprisingly straight-forward, with the concrete face of equally high-grade. Using these methods, the approx. 520 meters of linear wall were completed to the customer’s full satisfaction.